Harry Tracy Water Treatment Plant Long-Term Improvement Project
Client
San Francisco Public Utilities Commission
Location
SAN FRANCISCO, CA
Project Description
SRT was part of the design team for the San Francisco Public Utilities Commission (SFPUC) Harry Tracy Water Treatment Plant Long Term Improvements Project (HTLTIP), aimed to prepare the HTWTP for a large seismic event. SRT has worked on the design of new filters to add to the existing filter capacity, an emergency disinfection facility, and the associated yard piping to prepare the HTWTP for a large seismic retrofit.
Unique Challenges
Value Added By SRT
SRT provided value by proposing a solution of integrating new filters into the existing sedimentation basin that was not being used by SFPUC. This idea allowed the team to locate the filters away from the newly discovered seismic fault lines, saving design and construction costs.