
Peters Creek Streamflow Enhancement
Client
Redwoods State Park
Location
LA HONDA, CA
Project Description
SRT provided planning, design, permitting, pre-construction support and construction oversight services for the construction of a new 600,000-gallon raw water tank, a raw water pump house, pre-treatment facility, and transmission piping. The project allows this small water system to avoid diverting water from its surface water source during the dry season, thereby enhancing streamflows for local fish populations. The design took into consideration both forbearance requirements from conservation stakeholders and the Park’s water quality, operations, and water demand needs. SRT’s deliverables supported Trout Unlimited grant funding applications, which successfully financed this project.
Unique Challenges
Value Added By SRT
SRT utilized its interdisciplinary technical expertise to provide in-depth technical services tailored to each phase of the project, including the conceptual design, permitting deliverables to the California Division of Drinking Water, full design, pre-construction services, and engineering services during construction.


