Navigating compliance and permitting issues often involves ongoing coordination with federal, state, and local agencies to meet stringent regulatory requirements and deadlines. SRT is skilled at navigating through California’s regulatory maze and use a preemptive approach to identify potential issues early in your project.

Our clients utilize SRT staff’s previous working relationships with regulatory administrators as well as our knowledge of common pitfalls. We streamline the regulatory compliance process and recognize the influence of environmental, operational and design considerations that can dramatically affect your projects’ timeline.

https://www.srtconsultants.com/wp-content/uploads/2015/07/Water-Tank-Design_2.jpg

Permitting, Design, and Construction Management of a 0.5-M Gallon Potable Water Reservoir

Montara Water and Sanitary District (MWSD) hired SRT Consultants (SRT) in an effort to construct a potable water storage tank. Alta Vista Tank #2 holds 500,000 gallons and sits at the elevation of the existing and adjacent Alta Vista Tank #1. Since the location of the tank happens to be in a seismically active area, the tank is prestressed ...
https://www.srtconsultants.com/wp-content/uploads/2015/07/Wastewater-Design-Consulting_SAM.jpg

Wet Weather Flow Management Project

SRT was contracted to provide conceptual engineering, permitting, and design for six 160-foot-long 72-inch diameter reinforced concrete storage pipes to temporarily store about 0.2 million gallons of excess wet weather sewage during a 5-year, 6-hour storm, or similar sized event. The system was designed as a passive storage system, requiring ...
https://www.srtconsultants.com/wp-content/uploads/2015/07/Water-Tank-Design_CCWD.jpg

Hazen's Tank Design

Coastside County Water District (CCWD) retained SRT to provide design services for removing and replacing the District’s 100,000 Gallon redwood tank with a new welded steel tank.
https://www.srtconsultants.com/wp-content/uploads/2015/07/Wastewater-Design_SCCSD.jpg

Wet Weather Retention Structure Design

SCCSD retained SRT to provide design services, develop construction plans, specifications, and construction cost estimates for a 100,000 gallon capacity wet weather retention basin. The retention structure is completely buried and operated by gravity allowing excessively high flows to be temporarily stored until the storm has subsided and the pump station ...
https://www.srtconsultants.com/wp-content/uploads/2015/07/Design-and-Construction_Girl-Scouts.jpg

Surface Water Treatment Plant Design and Implementation

Girl Scouts of Northern California hired SRT Consultants to design and implement a technically proficient and cost-effective treatment alternative for the Girl Scout’s Camp Butano Creek surface water facility, providing as-needed assistance for the system design and installation, regulatory compliance, and development of O&M documents.
https://www.srtconsultants.com/wp-content/uploads/2015/07/Pipeline-Rehabilitation_SFPUC.jpg

Sunset South Inlet Repair and Rehabilitation

SRT aided the City Distribution Division (CDD) of the San Francisco Public Utilities Commission (SFPUC) in the planning, design, and execution of pipeline repairs and new pipe anchors for their 42-Inch submerged steel inlet pipeline. SRT further aided in review of the project need, hydraulic considerations ...
https://www.srtconsultants.com/wp-content/uploads/2015/07/Water-Tank-Design_1.jpg

Permitting, Design, and Construction Management of Two 100,000-Gallon Drinking Water Reservoirs

Montara Water and Sanitary District (MWSD) hired SRT Consultants (SRT) in an effort to replace the current deteriorated tank with two new welded steel storage tanks. Each tank is 100,000 gallons and sits at the elevation of the existing concrete tank. A ...
https://www.srtconsultants.com/wp-content/uploads/2015/07/Wastewater-Design_EBMUD1.jpg

Digester Upgrade Project

As part of a consultant team with Brown and Caldwell (B&C), SRT provided engineering expertise for EBMUD’s wastewater treatment plant (WWTP) solids handling facilities. The evaluation resulted in recommended improvements for the system, as well as solids facility design services, and engineering services during construction ...
https://www.srtconsultants.com/wp-content/uploads/2015/07/Water-Storage-and-Conveyance-Design_SFPUC.jpg

As-Needed Design of Storage and Conveyance Infrastructure Design

SRT was retained by the San Francisco Public Utilities Commission’s (SFPUC) City Distribution Division (CDD) to provide as needed engineering services for design of new water storage and conveyance infrastructure as part of the redevelopment of Treasure Island and Yerba Buena Islands in the San Francisco Bay. Services included ...